We're about one month into our log home renovation and here are some thoughts:
Home Facts For Month 1:
- Built a new floor
- Painted underneath the old floor
- Demolished the kitchen
- Took off every piece of drywall
- Replaced the side door
- Put up new drywall in the bathroom
- Took out the old baseboard heaters
- Installed new baseboard heaters
- Built new steps for the front porch
- Removed all of the OSB from the floors
- Removed the furnace and entire duct work
- Replaced the basement door
- Replaced outside lighting fixtures
- Moved the basement steps to the other side of the basement
Time Suck
The work never ends. Because my husband and I both work full time, finding the time to work on this house has been a challenge. Going from having free nights and weekends to working all the time has been a personal challenge for me.